A February 1957 British Insulated Callender's Cables Limited advert. It notes that the BICC group had been chosen to design, manufacture and install the first 25kV single-phase AC overhead equipment in Britain (Manchester-Crewe and Colchester-Clacton-Walton). The illustration shows an EM2 DC electric locomotive.
This advert appears in the following categories: Traction: Class 77 ; Supplier: BICC ; Component: Electrification